5.3 Automatic control for pump starting and condenser starting in pumping direction

    5.3.1 The process for unit pump starting and condenser starting in pumping direction shall be as the followings.(1) Unit starting mode and unit to be started have been selected.(2) Pumping operation conditions of the selected unit are met.(3) The selected...[繼續(xù)閱讀]

水力發(fā)電廠自動(dòng)化設(shè)計(jì)

5.4 Automatic control from pumping to standstill and from pumping to generating

    5.4.1 The following steps shall be carried out for changeover from pumping mode to standstill.(1) Give a command the governor to close the guide vanes to minimum pump position.(2) Trip the generator circuit breaker and suppress the field.(3) Command the g...[繼續(xù)閱讀]

水力發(fā)電廠自動(dòng)化設(shè)計(jì)

6.1 General requirements

    6.1.1 Each controlled device (oil pumps,water pumps,compressors,etc.) of unit auxiliary equipment and plant common equipment should be provided with three control modes of “manual”,“automatic” and “off”. Each controlled device shall be equipped with a gro...[繼續(xù)閱讀]

水力發(fā)電廠自動(dòng)化設(shè)計(jì)

6.2 Automatic control of oil pressure system

    6.2.1 As each of the oil pressure system,used as the servomotor oil source for butterfly valve,spherical valve and ring gate,is equipped with two oil pumps,the pumps shall be in a lead-lag control arrangement and the main and standby motors shall be autom...[繼續(xù)閱讀]

水力發(fā)電廠自動(dòng)化設(shè)計(jì)

6.3 Automatic control of compressed air system

    6.3.1 When each compressed air system is equipped with several compressors,the compressors shall be designed in lead-lag control arrangement. When the air pressure of compressed air tank decreases to the 1st lower limit,the main compressor shall be starte...[繼續(xù)閱讀]

水力發(fā)電廠自動(dòng)化設(shè)計(jì)

6.4 Automatic control of unit service water supply system

    6.4.1 When adopting pump water supply system for each unit (or secondary circulation water system with filters),the control of pumps shall meet the following requirements.(1) The main pump shall start automatically as unit starts,and keeps working as unit...[繼續(xù)閱讀]

水力發(fā)電廠自動(dòng)化設(shè)計(jì)

6.5 Automatic control of drainage and dewatering system

    6.5.1 When the water level of drainage sump rises to the 1st upper limit,the main pump shall be started automatically. If the water level rises to the 2nd upper limit,the standby pump shall be started automatically,and the alarm shall be sent out. When wa...[繼續(xù)閱讀]

水力發(fā)電廠自動(dòng)化設(shè)計(jì)

6.6 Flood prevention system for powerhouse

    6.6.1 Three detectors or more shall be provided at the bottom floor of powerhouse (including operation corridor).6.6.2 Each level detector shall include two sets of output contacts at least. the alarm shall be sent out when water level exceeds the 1st upp...[繼續(xù)閱讀]

水力發(fā)電廠自動(dòng)化設(shè)計(jì)

6.7 Automatic control of transformer cooling system

    6.7.1 Fans shall keep working during operation of oil-natural-air-forced (ONAF) transformer and air-forced-cooling dry-type transformer. The permissible load and operation time of transformers without fans shall meet the requirements of manufacturers.6.7....[繼續(xù)閱讀]

水力發(fā)電廠自動(dòng)化設(shè)計(jì)

7.1 Selection of excitation system

    7.1.1 Excitation system shall meet the requirements of the generator and the power grid in various operation modes and in faults.7.1.2 Self-shunt potential source static excitation system should be adopted for excitation system.7.1.3 The relevant paramete...[繼續(xù)閱讀]

水力發(fā)電廠自動(dòng)化設(shè)計(jì)
科普知識(shí)
心理健康 優(yōu)生優(yōu)育 休閑旅游 健身美容 飲食健康 人與自然 地球家園 海洋技術(shù) 科海拾貝 科學(xué)之迷 科技前沿 科技史話 科幻未來 神話傳說 童話故事 致富指南 農(nóng)用物資 生物技術(shù) 畜牧獸醫(yī) 園林花卉 特產(chǎn)養(yǎng)殖 營(yíng)養(yǎng)早餐 減肥晚餐 晚餐食譜 營(yíng)養(yǎng)晚餐 減肥中餐 中餐文化 中餐菜譜 中餐營(yíng)養(yǎng) 健康早餐 減肥早餐 早餐食譜 晚餐禁忌 寶石鑒定 安全生產(chǎn) 安裝鉗工 鈑金技術(shù) 寶石觀察 焙烤工業(yè) 變性淀粉 插花技能 車工技術(shù) 道路工程 低壓電器 電氣工程 電氣設(shè)備 電網(wǎng)工程 電源技術(shù) 電站工程 淀粉科學(xué) 調(diào)味配方 發(fā)電節(jié)能 防水材料 飛機(jī)飛行 服裝生產(chǎn) 鋼鐵材料 工程建設(shè) 工業(yè)工程 公路工程 管道工程 罐頭工業(yè) 國(guó)際組織 國(guó)家電網(wǎng) 華北電網(wǎng) 火電工程 貨運(yùn)物流 機(jī)床設(shè)計(jì) 機(jī)電工程 機(jī)修鉗工 基本資料 家用電器 建設(shè)工程 節(jié)約用電 金銀技術(shù) 金屬材料 連續(xù)鑄鋼 輪機(jī)工程 奶牛養(yǎng)殖 農(nóng)村電工 配電技術(shù) 皮革工業(yè) 啤酒工業(yè) 蘋果產(chǎn)業(yè) 鉗工簡(jiǎn)明 青工車工 青年審美 肉類工業(yè) 入侵檢測(cè) 食品科學(xué) 世界修船 獸醫(yī)獸藥 水下工程 稅收制度 通信設(shè)備 統(tǒng)計(jì)公文 土木工程 維修電工 味精工業(yè) 文物鑒賞 物業(yè)電工 銑工計(jì)算 線損管理 鞋楦設(shè)計(jì) 煙草工業(yè) 鹽業(yè)產(chǎn)品 冶金產(chǎn)品 液壓技術(shù) 印刷科技 用電管理 油墨技術(shù) 軋鋼技術(shù) 粘接技術(shù) 照明設(shè)計(jì) 制漿造紙 土元養(yǎng)殖 兔場(chǎng)疾病 外國(guó)美術(shù)